Sprint 4: Feature Completion & Release¶
Nov 24 – Dec 15 · All deliverables due Dec 15, 11:59 PM (course evaluation due Dec 4) · 100 points (12% of course grade)
Sprint 4 is the last sprint of the semester. Its goal is to finish your team feature end to end, close your carryovers, and ship a final release of your project. The issue backlog, PR workflow, and general expectations carry forward; see Sprint 3 for anything not explicitly changed here. This page covers what is new or different in Sprint 4.
Sprint 4 at a glance
Key dates: Dec 4: course evaluation · Dec 15: everything else
Important rules (they cost the most points):
- No merge without an approval on the latest commit.
- Spec review on the issue, saying what was checked.
- Code review on the PR, saying what was checked.
- Every code PR links its issue.
- Real AI logs.
- Test Evidence table in every PR; expected values not copied from the code's output.
- Your team introduces no new test failures; skipped tests and disabled checks need an issue.
Unfamiliar with a term?
Check the Glossary for definitions of terms used throughout this page.
Before you begin¶
- Plan the rest of your team feature in the first days. List what is left (acceptance criteria not met, sub-issues not done, bugs found in reviews), write or update the sub-issues, and get their specs reviewed. In Sprint 3, teams that split the feature late had issues that could not start until other issues were merged, and those were finished on the last day with little time for review.
- Order your work by dependencies. If one issue blocks another, merge the blocking PR first and early. If a blocked issue cannot finish in time, move it out at planning time, not on the last day.
- Open PRs early. Reviews need time, and the end of the semester is busy for everyone.
- The final presentations (Dec 1 and Dec 3) are graded separately. See Final Presentations. They cover your Sprint 3 work and your plan for Sprint 4.
What is new in Sprint 4¶
- Lower scope minimum (D1): about half of previous sprints.
- Any kind of issue counts toward the minimum: team feature sub-issues, carryovers, bug fixes, hardening, and tech debt.
- Code reviews must say what was checked (item 3 in "Things that must improve").
- Final report (D6) adds a project summary, the status of your team feature, and a project retrospective.
- Course evaluation (D9), due Dec 4.
- Removed: mutation testing and the mid-sprint check-in.
Things that must improve¶
These rules carry over from Sprint 3 and will be graded strictly. Item 3 is new.
1. Independent approval before merging. A PR is merged only after a teammate approves its latest commit. Merging without an approval, or after pushing new commits since the approval, is not allowed. Once approved, the author may merge. Request the review on GitHub and notify your reviewer on Zulip; reviewers respond (approve or request changes) within 24 hours.
2. Spec reviews must be visible and show what was checked. Before coding starts, a teammate posts a review comment on the issue itself. The comment states what the reviewer checked: whether each acceptance criterion is clear and testable, which cases were considered (and whether they are covered), and whether the scope fits. If the reviewer finds problems, they list them and the author updates the spec. "Looks good!" with nothing about what was checked is not acceptable.
3. Code reviews must show what was checked (new). The same standard now applies to code reviews. In Sprint 3, every PR was approved before merging, but many approvals did not show any checking:
- Every approval should state what the reviewer checked: for example, whether the code meets each acceptance criterion, which cases and error paths were considered, whether the tests cover the acceptance criteria and their expected values are justified, and any design or maintainability concerns.
- A re-approval after "changes requested" should state what was re-checked. "Changes look good!" does not say whether the requested changes were made.
- AI may help draft a review, but you are responsible for it. Edit the draft, check its claims, and remove any template text before posting.
4. Link PRs and issues. Every code PR must link the issue it addresses. Use Closes #<issue> in the PR description and attach issues and code PRs to the Sprint 4 milestone.
5. AI logs must be real logs. A log shows your prompts and the AI's output (SpecStory format recommended; see the AI Log Instructions). The following are not logs and receive no full credit: summaries of a session, paraphrased prompts, a share link to a chat, or tool output without the prompts that produced it. File names must follow YYYY-MM-DD_<tool>_<short-slug>.md. Link the log from the issue or PR it documents.
6. The final report must render. Check that tables and links display correctly on GitHub (no escaped \| or \[). Use the Sprint 4 sections, not a copy of a previous report.
Deliverables¶
D1 - Sprint Backlog¶
Same process as Sprint 2 (D1), including the priority on carryovers: unfinished Sprint 3 issues go into your Sprint 4 backlog first, or you document on the issue why they are dropped.
Scope minimums for Sprint 4 (lower than in previous sprints):
| Role | Minimum issues |
|---|---|
| Each CSCI 435 member | at least 1 medium issue (or equivalent story points) |
| Each CSCI 535 (grad) member | at least 1 medium issue + 1 small issue (or equivalent story points) |
Any kind of issue counts: sub-issues of your team feature, carryovers, bug fixes (including bugs found in reviews), hardening issues (see Sprint 3, D1), and tech debt recorded in your PRs. Finishing your team feature comes first.
Scope must be justified. Each issue states its scope (small or medium) and one or two sentences on why: which components it touches and how much change you expect. The instructor or TA may reclassify an issue whose scope is clearly overstated.
Create a Sprint 4 milestone in GitHub and attach all selected issues to it.
What to provide in D6 (Final report): link to the Sprint 4 milestone and the rationale for your backlog decisions.
D2 - Requirements Specification¶
Same as Sprint 3 (D2). Specs must be written and reviewed before coding begins; see item 2 in "Things that must improve" for what counts as a review.
D3 - Design Decisions¶
Same as Sprint 2 (D3): each decision names at least two concrete alternatives and explains the choice.
D4 - Code Changes and Pull Requests¶
Same as Sprint 3 (D4), including the Tech Debt and Test Evidence sections in every PR description.
Test suite. Your team introduces no new test failures: any test your team's changes break must be fixed by the end of the sprint. Skipping a test or disabling a CI check requires a linked issue and a reason in a code comment. If your fork has no CI that runs your tests, include in the PR description the command(s) you ran and a summary of the results (passed, failed, skipped).
Reviewers post a review comment using this rubric, and the comment states what was checked (item 3 in "Things that must improve"). The Notes column explains each score in one or two sentences.
## Code Review
| Criterion | Score (1–10) | Notes |
|---|---|---|
| Correctness: does the change do what the issue asked? | | |
| Test coverage: are tests present and meaningful? | | |
| Test evidence: does every AC have a test? Are the expected values justified? | | |
| Code quality: consistent style, clear naming, no unnecessary duplication | | |
| Documentation: inline comments and PR description are clear | | |
| AI transparency: if AI was used, is there evidence of human verification? | | |
| Overall: would you merge this as-is? | | |
D5 - AI Logs¶
Same requirements as Sprint 1 (D5) and the AI Log Instructions, with the enforcement described in item 5 of "Things that must improve."
Log storage: ai-logs/sprint4/<your-github-username>/
D6 - Final Report¶
Same format as Sprint 1 (D6 in Sprint 1), with these additions:
-
Project summary (new section). In a few sentences or bullets, describe how the system itself changed from your Sprint 0 release to your final release: what it can do now that it could not do before, what works better, and which parts of the system changed most.
-
Team feature status (new section). A table with one row per acceptance criterion of your team feature (from the feature issue and its sub-issues):
Acceptance criterion Status Evidence AC1: ... Works end to end / Partial / Not done PR, test, or manual check that shows it Below the table, explain in a few sentences what is left and why. Be honest: an accurate "Partial" is better than an unsupported "Works."
-
Project retrospective (new section). Looking back at the whole project (Sprints 0 to 4), not only this sprint. Answer each question in a few sentences, specific to your team's experience:
- What worked well in your team's process (including testing and reviews), and what you would do differently if you started again.
- How your team's use of AI tools changed over the semester, and what the team learned about using them well.
- What was hardest about understanding and changing a large, existing open-source project, and how your understanding of its architecture grew.
- One or two concrete pieces of advice for a team starting this project next year.
- Carryovers from Sprint 3 and what changed.
Submit to: docs/sprint4/report.md (or .pdf, .docx). If you submit Markdown, check that it renders on GitHub.
D7 - Final Release¶
Same as Sprint 1 (D7 in Sprint 1). Tag with the -csci435-s4 suffix.
This is the final release of your project. Create it after the last Sprint 4 merge, so it matches the final state of your default branch. The release description summarizes the sprint's changes (features, fixes, hardening work) and states the status of your team feature, not just the tag name.
D8 - Reflection Survey (Individual)¶
Each team member must complete the Sprint 4 reflection survey individually. The link will be distributed via Blackboard and Zulip toward the end of the sprint.
Deadline: Dec 15, 11:59 PM.
D9 - Course Evaluation (Individual)¶
Due: Dec 4, 11:59 PM.
We would like to hear from you. This course is still evolving and your feedback is fundamental to improving the course. Please let us know what went well, what helped you learn, and what you would change to improve the course. Any feedback is welcome about topics, lectures, sprint structure, deliverables, AI tools, grading, etc.
Please fill out the official W&M course evaluation at evals.wm.edu and then submit a confirmation on the Blackboard item "Course Evaluation Confirmation." Evaluations are anonymous: the instructor sees only combined results, after final grades are submitted. We only record that you confirmed.
Grading¶
Sprint 4 is worth 100 points (12% of the course grade). D1, D6, and D7 are graded as a team; all other deliverables are graded individually.
| Deliverable | Points | Notes |
|---|---|---|
| D1 - Sprint Backlog | 10 | Team. Issues selected, scoped with justification, assigned, milestone created; carryover decisions documented |
| D2 - Requirements Specification | 20 | Individual. User story format, INVEST criteria, acceptance criteria quality; spec review on the issue before coding, showing what was checked |
| D3 - Design Decisions | 5 | Individual. At least one non-trivial decision per issue, with alternatives |
| D4 - Pull Requests | 27 | Individual. See detail below |
| D5 - AI Logs | 5 | Individual. Real logs, correctly named, linked from the issue or PR |
| D6 - Final Report | 15 | Team. Completeness, specificity, quality of evidence; project summary; team feature status; project retrospective |
| D7 - Final Release | 5 | Team. Tag follows convention; created after the last merge; release description summarizes changes and feature status |
| D8 - Reflection Survey | 8 | Individual. Required for completion |
| D9 - Course Evaluation | 5 | Individual. Confirmed on Blackboard by Dec 4 |
| Total | 100 |
D4 - PR grading detail:
The D4 score is the aggregate across all your PRs, normalized to 27 points.
| Criterion | Points per PR |
|---|---|
| Change correctly implements the acceptance criteria from D2 | 6 |
| Tests written or updated appropriately; Test Evidence section complete, with every AC covered and expected values justified | 6 |
| PR description explains what changed and why; Tech Debt section present; issue linked | 3 |
| CI passes (or manual verification documented); no new test failures | 3 |
| Code reviewed using the rubric; review states what was checked; PR merged only after an approval on the latest commit | 2 |
| Total per PR | 20 |
Reviews you write for teammates are also part of your D4 score: an approval that does not state what was checked (item 3 in "Things that must improve") lowers the review criterion for that PR.
Minimum bar
A team with no merged PRs (D4), no final report (D6), or no final release (D7) receives a 0 for Sprint 4 regardless of other deliverables.
Extra credit
- A PR submitted to the real upstream project and accepted or under active review earns up to 3 bonus points per PR, at the instructor's discretion.
- A bug report filed in the upstream project that comes from your own testing work and is confirmed by the maintainers (by the time Sprint 4 is graded) earns up to 2 bonus points per report, at the instructor's discretion.
Submission checklist¶
Push the following to your team's GitHub repository by Dec 15, 11:59 PM:
- Sprint 4 milestone with all selected issues attached, assigned, and scoped with justification (D1)
- Issue bodies with user stories or bug reports, acceptance criteria, and design decisions with alternatives; spec review comments on each issue (D2, D3)
- All PRs merged after an approval on the latest commit; each PR description links its issue and includes the Tech Debt and Test Evidence sections; code review on each PR stating what was checked (D4)
- AI logs in
ai-logs/sprint4/<github-username>/, namedYYYY-MM-DD_<tool>_<short-slug>.md, linked from the issue or PR (D5) docs/sprint4/report.md(or.pdfor.docx), including the project summary, team feature status, and project retrospective (D6)- Final release tag pushed and GitHub release created after the last merge (D7)
- D8 reflection survey submitted individually by Dec 15, 11:59 PM
- D9 course evaluation confirmed on Blackboard by Dec 4